Snag (august 10)

Today I woke up and headed on our way to the Eco-Exhibit from Minnetonka. On the way we were slowed up by a bad crash in both east and west tunnels so Nick and I busted out the iPhone to find our way through traffic. We were about a half an hour late, not bad considering the traffic we almost got stuck in. On site I began work again on the shelving structure but soon switched over because the electrician had arrived. I gave him a rundown on the routes and left him to his work while Nick and I once again braved traffic in pursuit of some LED recessed fixtures. We ended up driving all the way to Plymouth to pick up the fixtures and we are still one short, but we will get it. Once back on site I continued to work on the shelving but only in brief moments. I was informed by the electrician that he ran into a little snag with the inspector and that we are unable to use the LED ribbon lights in the windows… Well this is still getting resolved it is a problem. I hope tomorrow we can begin to sort it out. The shelving was put in place and the day ended. I can already feel time creeping up on us.