Today we had to park out of the regular lot because they were marking out a parking lot in the gravel. As soon as I got there I got to work on the light boxes. Soon the electrician showed up and we were underway. I got the LED cans in and finished up the rest of the wiring runs. We still have a couple issues to work out but all the electrical is looking great. Several trucks dropped of materials today and we got out mechanical system today. It was a bit more confusing than I expected. No lego booklet with this one, and a lot of the parts are labeled in german. The robot of a device was planned out on the floor so we could test fit everything. We scratched our heads for a while and put it the robot back in its box until tomorrow. Andrew and I finished up the shelving while the slats went up on the other side. It was rewarding to finish the south side of the shelving. It was exactly what Andrew and I had drawn up. It had a progression up even though no stairs existed. Tomorrow will be busy, I can’t wait to see this mammoth of a sliding door. Word in the passive house is that the sliding door weighs about a thousand pounds.