Grounded (august 15)

We arrived with our heads high and started straight away. The north and east side were getting finished up while the shading structure was getting stitched to the ground. The cables were put in along with the rings, a detail worth the exploration. Granite arrived and Andrew stated to fill the time boxes. The rock boxes looked great. After a bit we had a guest to talk to us about the infamous robot in the box. After some discussion we made some decisions and Nick, Peter and I hung the mechanical system any adjusted the walls. The day carried on, and on. We ordered pizza, the sun went down and the building came to life. It looked as though it was a model built in studio, in fact this evening felt like a late night in studio.